Why DFW contractors choose us
- Laser-level precision to achieve exact dock heights of 48-52 inches matching standard trailer bed elevations
- Reinforced construction to handle 100,000+ lb concentrated loads from forklifts and pallet jacks
- Integration with dock levelers, bumpers, and drainage systems for complete functionality
Project capabilities
We specialize in complete loading dock construction including foundation work, approach slabs, dock pits, and equipment pad integration. Our crews work closely with loading dock equipment suppliers to ensure proper dimensions, anchor embedments, and utility conduit placement. We handle all aspects from excavation through final finishing, coordinating with warehouse operations to minimize downtime.
Frequently Asked Questions
- What is the standard loading dock height for warehouses in Dallas, TX?
- In Dallas, TX, standard loading dock heights are 48-52 inches from finished grade to match typical semi-trailer bed heights. Many Dallas-Fort Worth distribution centers opt for 48-inch heights as this accommodates both standard trailers and step-deck configurations common in Texas freight operations. We can also build adjustable height docks for facilities handling varied equipment.
- How long does loading dock construction take for a new warehouse in Dallas in Dallas, TX?
- For new warehouse construction in Dallas, TX, a typical 6-bay loading dock takes 2-3 weeks from excavation to final finish, weather permitting. The Dallas-Fort Worth area's generally favorable weather allows year-round construction, though we avoid pouring during the rare winter freezes. Retrofit projects at existing facilities typically take less time as foundation work is already complete.
- Why choose professional loading dock construction services in Dallas, TX?
- Professional loading dock construction services in Dallas, TX ensure compliance with local building codes, proper material selection for Texas climate conditions, and experienced crews familiar with DFW-area construction practices and soil conditions.
- How long do loading dock construction projects typically take in Dallas, TX?
- loading dock construction project timelines in Dallas, TX vary by scope, but our experienced crews typically complete most commercial projects within 2-6 weeks from mobilization to completion, coordinating with local inspectors and utility providers.

