Transformer Pads commercial concrete services

Commercial Concrete Service

Transformer Pads

Heavy-duty concrete transformer pads engineered for electrical distribution equipment, meeting utility company specifications and load requirements.

Why DFW contractors choose us

  • Structural design supporting 10,000-50,000 lb transformer loads with proper safety clearances
  • Oil containment integration for environmental protection per utility requirements
  • Coordination with utility companies ensuring compliance with standard specifications

Project capabilities

We provide transformer pad installation following utility company specifications including exact dimensions, reinforcement schedules, and grounding provisions. Our crews coordinate with electrical contractors and utility representatives on placement, clearances, and access requirements. All installations include proper compacted base, reinforced concrete, and any required containment features.

Frequently Asked Questions

What are the specifications for transformer pads in Dallas, TX?
Oncor (the primary utility in Dallas, TX) requires transformer pads meeting specific dimensions, typically 6x8 feet minimum with 6-inch thickness and proper reinforcement. Dallas-Fort Worth commercial developments must provide pads that support transformer weight while allowing utility access and meeting clearance requirements. We install pads to Oncor specifications and coordinate inspections with the utility before transformer placement.
Do transformer pads require oil containment in Dallas in Dallas, TX?
While not always required in Dallas, TX for smaller pad-mount transformers, many commercial developments in the Dallas-Fort Worth area choose to install containment as environmental protection. Larger liquid-filled transformers typically require secondary containment per EPA and Texas environmental regulations. We can integrate containment curbs or install pads within separate containment structures based on project requirements.
Why choose professional transformer pads services in Dallas, TX?
Professional transformer pads services in Dallas, TX ensure compliance with local building codes, proper material selection for Texas climate conditions, and experienced crews familiar with DFW-area construction practices and soil conditions.
How long do transformer pads projects typically take in Dallas, TX?
transformer pads project timelines in Dallas, TX vary by scope, but our experienced crews typically complete most commercial projects within 2-6 weeks from mobilization to completion, coordinating with local inspectors and utility providers.

Schedule Your Crew

Ready to pour the next phase of your project?

Call our Dallas estimating team for engineered concrete packages, tilt-wall scopes, and heavy-duty paving across North Texas.